Rss Feed
Tweeter button
Facebook button
1


Pam's Blog

Pam's Blog

Water Mains

Fri Mar 25, 4:54 AM

Spring has sprung.  I hope everyone is enjoying these beautiful, longer days.  With spring comes infrastructure work and, unfortunately, this means cutting through our new pavement.  We delayed the paving a year to complete our drainage work, however, this was not the case for the repairs.  The municipality is meeting many challenges as we prepare to bring the new water system completely on line.  Once the lines are either repaired or replaced, the pavement will be repaired.  We will need to be diligent to report any deficiencies in this repair work immedialtely.  Please call me or the municipality. These jobs have time frames for warranties and things like settling ground and other incidents can hamper the quality, through no fault of the contractor.  Enjoy the sunshine!

Blog Archives

Pam

Tel: 902-758-3330